Pro Rib Steel Roofing Installation
Lay down the first roof steel panel squaring it with the mason line.
Pro rib steel roofing installation. The washer under the screw head should seal to the surface of the panel without bulging or shifting. Pro panel ii install guide. Using screws fasten roof at top and bottom of the sheet in the flat next to each rib. This guide is supplied by fabral inc.
All intermediate fasteners can be. Pdf 779 kb ul 560 pro rib roof construction. Between the shingles and metal roof panels is a standard practice. Cut the first rib off leaving of rib on the first roof sheet of roof steel.
This guide must by read in its entirety before beginning installation. Pdf 31 kb ul 529 pro snap roof construction. Pdf 2 mb premium pro snap snow bar clip installation. Pdf 27 kb menu.
Grand rib 3 style metal roofing can be separated from the moisture barrier by minimum nominal 1 x3 yellow pine battens spaced on maximum 24 centers or according to asce calculations where applicable. Give our friendly sales staff a call if you have any questions. For use by its customers and is intended to be a guide only. Install the roofing screws vertically along each rib in the panel.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater. Secure the screws but do not overtighten. Pdf 740 kb steel siding installation. Menards is your 1 source for all your steel roofing needs.
This manual is designed to be utilized as a guide when installing post frame and residential roofing systems. Pdf 780 kb premium pro steel gutter systems installation. First choose from four different steel panels. Pdf 2 mb chimney flashing instructions.
A relatively complicated roof is shown to allow for the many types of trim and roof plans. The roof panels are installed similar to the wall panels in layout. Whether you re building a new home or want to replace your existing roof there s no better option than steel. Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
It is the responsibility of the erector to ensure the safe installation of this product system.