Putting Up Drip Edge On Trim Siding Attaching
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
Putting up drip edge on trim siding attaching. Find your most beat up pieces of siding and rip them down into 1 1 4 in. If it doesn t pull the drip edge out slightly from under the shingles. When installing the starter strips allow a 1 8 inch space for corner posts and j channels for expansion. Some drip edge flashings actually help houses turn to mush.
Outward kick along the bottom. At the sides of the casings jab your brush into joints then smooth out the paint to seal them. To seal the edge of a siding panel where it has been cut and to secure it to the wall you can use under sill trim. Snap a line 1 in.
Turns out not all drip edge flashing perform the same. At casings and for the undersides of siding laps you may prefer to use a corner roller. As seen in m. The drip leg is at least 3 4 in.
Keep ends of adjoining starter strips at least 1 4 inch apart to allow for expansion. Overlap two pieces of flashing that meet end to end by at least 1 inch. Nail in the center of the nailing slots. Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg. Also called drip edge flashing or d metal they serve a vital function by directing water away from the fascia and into the gutter. And i include a 1 4 in. How to install a drip edge.
Create a drip edge. Use 1 inch galvanized roofing nails or 3 4 inch exterior screws. Without a drip edge water may end up beneath the shingles and may cause damage to various parts of the home. At the top of each casing you ll find a drip cap or metal flashing that tucks up under the siding.
This does two things it pushes the water a little further out away from the trim the flashing is protecting and it helps stiffen the bottom edge so it stay straight as the metal expands and contracts with temperature. Does the drip edge metal go under the tarpaper ice and water shield or underlayment on the eave. Above the bottom of the wall sheathing as a guide. Space the fasteners by about 12 inches.
Push one end of longer pieces into the trim then bow the siding slightly and guide the other end into the trim. Get the real story about drip edge placement. Then slide it up and snap the butt into the locking edge of the piece below. These strips installed at the bottom will make your first row of siding angle out to match the rest of the rows.
Drip edges are metal sheets usually shaped like an l installed at the edge of the roof. Drip edge roof flashing types. L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg. Paint a tight seal between metal and wood.
Secure the drip edge with roofing cement.